Browse by Aston Author

Up a level
Export as [feed] Atom [feed] RSS
Group by: Item Type | Date | No Grouping
Number of items: 14.

Whang, Seoung-Wook, Park, Kenneth Sungho and Kwon, Choulwoong (2023). influence of aesthetic design elements on residential satisfaction in apartment Based on Seoul apartment complex. Journal of Asian Architecture and Building Engineering ,

Le, An Thi Hoai, Domingo, Niluka, Rasheed, Eziaku and Park, Kenneth (2023). Development and application of a framework for managing school buildings: A case study in New Zealand. Journal of Building Engineering, 77 ,

Gharbia, Marwan, Chang-Richards, Alice, Xu, Xun, Höök, Matilda, Stehn, Lars, Jähne, René, Hall, Daniel, Park, Kenneth, Hong, Jingke and Feng, Yingbin (2023). Building Code Compliance for Off-Site Construction. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15 (2),

Le, An Thi Hoai, Domingo, Niluka, Rasheed, Eziaku and Park, Kenneth (2021). Maturity model of building maintenance management for New Zealand’s state schools. Building Research & Information ,

Le, An, Park, Kenneth Sungho, Domingo, Niluka, Rasheed, Eziaku and Mithraratne, Nalanie (2021). Sustainable Refurbishment for School Buildings:A Literature Review. International Journal of Building Pathology and Adaptation, 39 (1), pp. 5-19.

Whang, Seoung-wook, Park, Kenneth and Kim, Sangyong (2019). Critical Success Factors for Implementing Integrated Construction Project Delivery. Engineering, Construction and Architectural Management, 26 (10), pp. 2432-2446.

Finnie, David, Ali, Naseem Ameer and Park, Kenneth (2019). Design development post contract signing in New Zealand:Client's or contractor's cost? Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 172 (4), pp. 146-156.

Kim, Ki Pyung and Park, Kenneth Sungho (2018). Delivering Value for Money with BIM-embedded Housing Refurbishment. Facilities, 36 (13/14), pp. 657-675.

Kim, Ki Pyung and Park, Kenneth Sungho (2018). Housing Information Modelling for BIM-embedded Housing Refurbishment. Journal of Facilities Management, 16 (3), pp. 299-314.

Kahandawaa, K.A.R.V.D., Domingo, N.D., Park, Kenneth Sungho and Uma, S.R. (2018). Earthquake damage estimation systems: Literature review. IN: Procedia Engineering. Elsevier.

Finnie, David, Ali, Naseem Ameer and Park, Kenneth (2017). Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 171 (4), pp. 176-185.

Park, Kenneth S. and Kim, Ki P. (2014). Essential BIM input data study for housing refurbishment:Homeowners' preferences in the UK. Buildings, 4 (3), pp. 467-487.

Kim, Ki and Park, Kenneth (2012). 건설 프로젝트 프로세스 관리 효율화를 위한 영국과 미국의 BIM 현황 분석. 프로젝트 경영학회지 [Project Management Review], 2 (2), pp. 1-16.

Park, Sung Ho (2009). Whole life performance assessment: critical success factors. Journal of Construction Engineering and Management, 135 (11), pp. 1146-1161.

This list was generated on Thu Oct 17 03:28:57 2024 BST.