Browse by Aston Author

Up a level
Export as [feed] Atom [feed] RSS
Group by: Item Type | Date | No Grouping
Number of items: 12.

Finnie, David, Ali, Naseem Ameer and Park, Kenneth (2019). Design Development Post Contract Signing - Client or Contractors Cost? Proceedings of the Institution of Civil Engineers - Management, Procurement and Law , pp. 1-9.

Whang, Seoung-wook, Park, Kenneth and Kim, Sangyong (2019). Critical Success Factors for Implementing Integrated Construction Project Delivery. Engineering, Construction and Architectural Management , (In Press)

Kim, Ki Pyung and Park, Kenneth Sungho (2018). Housing Information Modelling for BIM-embedded Housing Refurbishment. Journal of Facilities Management, 16 (3), pp. 299-314.

Le, An, Park, Kenneth Sungho, Domingo, Niluka, Rasheed, Eziaku and Mithraratne, Nalanie (2018). Sustainable Refurbishment for School Buildings:A Literature Review. International Journal of Building Pathology and Adaptation ,

Kim, Ki Pyung and Park, Kenneth Sungho (2018). Delivering Value for Money with BIM-embedded Housing Refurbishment. Facilities, 36 (13/14), pp. 657-675.

Kahandawaa, K.A.R.V.D., Domingo, N.D., Park, Kenneth Sungho and Uma, S.R. (2018). Earthquake damage estimation systems: Literature review. IN: Procedia Engineering. Elsevier.

Finnie, David, Ali, Naseem Ameer and Park, Kenneth (2017). Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 171 (4), pp. 176-185.

Asli, Rajul Adli, Wedawatta, Gayan, Hedges, Peter and Park, Kenneth (2016). Building environmental assessment scheme for residential building in Brunei. IN: Proceedings of the 32nd Annual ARCOM conference. Chan, P.W. and Neilson, C.J. (eds) Manchester (UK): Association of Researchers in Construction Management.

Schmickler, Arno and Park, Kenneth Sungho (2014). UK social housing and housing market in England:a statistical review and trends. LHI Journal of Land, Housing, and Urban Affairs, 5 (3), pp. 193-201.

Kim, Ki and Park, Kenneth (2012). 건설 프로젝트 프로세스 관리 효율화를 위한 영국과 미국의 BIM 현황 분석. 프로젝트 경영학회지 [Project Management Review], 2 (2), pp. 1-16.

Park, Kenneth S. and Kim, Ki P. (2011). Essential BIM input data study for housing refurbishment:homeowners’ preferences in the UK. Buildings, 4 (3), pp. 467-487.

Park, Sung Ho (2009). Whole life performance assessment: critical success factors. Journal of Construction Engineering and Management, 135 (11), pp. 1146-1161.

This list was generated on Tue Jul 16 02:05:33 2019 BST.