An agent-based heuristics optimisation model for production scheduling of make-to-stock connector plates manufacturing systems

Abstract

The manufacturing systems' success directly relates to their accurate, reliable and flexible schedules, including how production is planned and scheduled and which constraints are considered in generating the schedules. The study's objective arises from the need to generate an optimal production scheduling system in a connecting plates manufacturing company that works on a Make-To-Stock basis. This research investigates the impact of demand and operational constraints on production schedules, including the facility capacity, operators and machines availability, raw materials availability, inventory level and warehouse capacity. A multi-agent-based optimisation model is developed to face the complexity of considering demand and operational constraints and reflects their impact on generating a reliable production schedule. This model involves a proposed heuristic algorithm that considers demand and operations constraints in such a manufacturing environment and optimises the production schedule based on these restrictions/requirements. A real-life case study based on a connecting plates manufacturer company is used as a test bench of the proposed agent-based heuristic optimisation model. The proposed algorithm is compared with other related approaches to check its superiority based on key criteria, including inventory levels, missed/unsatisfied orders and total production time. Results show that the proposed heuristics algorithm reduced the number of missed orders by 34% compared with similar approaches.

Publication DOI: https://doi.org/10.1007/s00500-023-09506-w
Divisions: College of Business and Social Sciences > Aston Business School
College of Business and Social Sciences > Aston Business School > Operations & Information Management
Additional Information: This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article’s Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit https://creativecommons.org/licenses/by/4.0/.
Uncontrolled Keywords: Demand and operational constraints,Heuristics optimisation,Make-to-Stock environment,Multi agent-based model,Production scheduling
Publication ISSN: 1433-7479
Last Modified: 30 Apr 2024 07:34
Date Deposited: 02 Jan 2024 17:55
Full Text Link:
Related URLs: https://link.sp ... 500-023-09506-w (Publisher URL)
http://www.scop ... tnerID=8YFLogxK (Scopus URL)
PURE Output Type: Article
Published Date: 2023-12-21
Published Online Date: 2023-12-21
Accepted Date: 2023-11-22
Authors: Madi, Faris
Al-Bazi, Ammar (ORCID Profile 0000-0002-5057-4171)
Buckley, Steve
Smallbone, John
Foster, Karl

Download

[img]

Version: Published Version

License: Creative Commons Attribution

| Preview

Export / Share Citation


Statistics

Additional statistics for this record