From Pre-Swelling to Performance Enhancement: Mechanisms and Effects of an Instant Ultra High-Performance Bituminous Material Modifier

Abstract

To elucidate the modification and pre-swelling mechanisms of instant bituminous modifiers and their contribution to bituminous materials’ performance, this study investigates an instant ultra-high-performance bitumen modifier (SHVE-M). Fluorescence microscopy (FM), gel permeation chromatography (GPC), physical property tests, viscoelastic properties tests, dynamic shear rheometer (DSR), and mixture pavement performance tests were employed to systematically characterise the instant modified bitumen (SHVE-MB) and its mixture (SHVE-MBM). The results indicate that SHVE-M forms a stable “bitumen phase–polymer spherical phase” structure. ImageJ-win64 analysis revealed that SHVE-M exhibits a modifier area fraction of 46.68% and an average area fraction of 0.22‰, while SHVE-MB achieves a modifier area fraction of 17.54% and an average area fraction of 0.18‰. This morphology is supported by a large molecular size (LMS) content of 43% in SHVE-M. In terms of physical properties, the SHVE-MB (prepared via 10 min shearing) exhibited a penetration of 46.2 dmm, a softening point of 91.7 °C, and a ductility of 34.3 cm. These values are highly comparable to the conventional wet-process HVE-MB (prepared via 4 h maturation), with negligible differences of 0.5 dmm, 1.7 °C, and 1.4 cm, respectively. Quantitatively for viscoelasticity, SHVE-MB achieved a dynamic viscosity of 425,283.4 Pa·s at 60 °C and an elastic recovery rate of 92.1%, paralleling the 414,623.7 Pa·s and 93.6% of HVE-MB. Regarding mixture performance, the high-temperature dynamic stability (DS) of SHVE-MBM reached 7974 times/mm, approaching the 8256 times/mm of HVE-MBM. The water stability was excellent with a splitting tensile strength ratio (TSR) of 97.4% (vs. 98.0% for HVE-MBM). Furthermore, the low-temperature fracture toughness (KIC) reached 39.8 N/mm1.5, significantly outperforming SBS-MBM (27.9 N/mm1.5) and remaining close to HVE-MBM (43.9 N/mm1.5). These findings indicate that SHVE-MB effectively bridges the performance gap between instant and traditional high-viscosity modified bitumen, and the pre-swelling mechanism of SHVE-M is well characterized in this study.

Publication DOI: https://doi.org/10.3390/ma19030633
Divisions: College of Engineering & Physical Sciences > School of Infrastructure and Sustainable Engineering > Civil Engineering
College of Engineering & Physical Sciences
Funding Information: This work was supported by the Transportation Technology Project of the Department of Transport of Hubei Province (No. 2022-11-1-10 and No. 2023-107-1-14).
Additional Information: Copyright © 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.
Uncontrolled Keywords: instant modifiers,dry-process modification,high-performance modified bitumen,pre-swelling mechanisms,rapid swelling,composite polymer
Publication ISSN: 1996-1944
Last Modified: 26 Feb 2026 08:11
Date Deposited: 24 Feb 2026 13:22
Full Text Link:
Related URLs: https://www.mdp ... 6-1944/19/3/633 (Publisher URL)
PURE Output Type: Article
Published Date: 2026-02-06
Published Online Date: 2026-02-06
Accepted Date: 2026-01-29
Authors: Li, Yuanyuan
Ji, Haowen
Wang, Chonghui (ORCID Profile 0000-0002-8753-7518)
Zhang, Derun
Wang, Fu
Jiang, Gangping
Deng, Jiahui
Ke, Junjie

Download

[img]

Version: Published Version

License: Creative Commons Attribution


Export / Share Citation


Statistics

Additional statistics for this record