Productivity analysis and measurement

Abstract

The state of the art in productivity measurement and analysis shows a gap between simple methods having little relevance in practice and sophisticated mathematical theory which is unwieldy for strategic and tactical planning purposes, -particularly at company level. An extension is made in this thesis to the method of productivity measurement and analysis based on the concept of added value, appropriate to those companies in which the materials, bought-in parts and services change substantially and a number of plants and inter-related units are involved in providing components for final assembly. Reviews and comparisons of productivity measurement dealing with alternative indices and their problems have been made and appropriate solutions put forward to productivity analysis in general and the added value method in particular. Based on this concept and method, three kinds of computerised models two of them deterministic, called sensitivity analysis and deterministic appraisal, and the third one, stochastic, called risk simulation, have been developed to cope with the planning of productivity and productivity growth with reference to the changes in their component variables, ranging from a single value 'to• a class interval of values of a productivity distribution. The models are designed to be flexible and can be adjusted according to the available computer capacity expected accuracy and 'presentation of the output. The stochastic model is based on the assumption of statistical independence between individual variables and the existence of normality in their probability distributions. The component variables have been forecasted using polynomials of degree four. This model is tested by comparisons of its behaviour with that of mathematical model using real historical data from British Leyland, and the results were satisfactory within acceptable levels of accuracy. Modifications to the model and its statistical treatment have been made as required. The results of applying these measurements and planning models to the British motor vehicle manufacturing companies are presented and discussed.

Divisions: College of Engineering & Physical Sciences
Additional Information: Department: Production Technology and Production Management If you have discovered material in AURA which is unlawful e.g. breaches copyright, (either yours or that of a third party) or any other law, including but not limited to those relating to patent, trademark, confidentiality, data protection, obscenity, defamation, libel, then please read our Takedown Policy and contact the service immediately.
Institution: Aston University
Uncontrolled Keywords: productivity,deterministic models,added value,stochastic models
Last Modified: 30 Sep 2024 07:30
Date Deposited: 07 Feb 2011 12:39
Completed Date: 1979
Authors: Jassbi, Abdollah J.

Download

Export / Share Citation


Statistics

Additional statistics for this record