Whole life performance assessment: critical success factors

Abstract

Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project's life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman's rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.

Publication DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000090
Divisions: College of Engineering & Physical Sciences > School of Infrastructure and Sustainable Engineering > Engineering Systems and Supply Chain Management
College of Engineering & Physical Sciences
Uncontrolled Keywords: life cycles,assessment,costs,contracts,construction management,contract management,bids,Strategy and Management,Industrial relations,Civil and Structural Engineering,Building and Construction
Publication ISSN: 1943-7862
Last Modified: 17 Apr 2024 07:09
Date Deposited: 11 Mar 2019 17:55
Full Text Link: http://scitatio ... =cvips&gifs=yes
Related URLs: http://www.scop ... tnerID=8YFLogxK (Scopus URL)
PURE Output Type: Article
Published Date: 2009-11
Authors: Park, Sung Ho (ORCID Profile 0000-0002-8406-3847)

Export / Share Citation


Statistics

Additional statistics for this record