Setting parameters in MRP for the effective management of bought-out inventory in a JIT assembly environment

Abstract

In recent years, UK industry has seen an explosive growth in the number of `Computer Aided Production Management' (CAPM) system installations. Of the many CAPM systems, materials requirement planning/manufacturing resource planning (MRP/MRPII) is the most widely implemented. Despite the huge investments in MRP systems, over 80 percent are said to have failed within 3 to 5 years of installation. Many people now assume that Just-In-Time (JIT) is the best manufacturing technique. However, those who have implemented JIT have found that it also has many problems. The author argues that the success of a manufacturing company will not be due to a system which complies with a single technique; but due to the integration of many techniques and the ability to make them complement each other in a specific manufacturing environment. This dissertation examines the potential for integrating MRP with JIT and Two-Bin systems to reduce operational costs involved in managing bought-out inventory. Within this framework it shows that controlling MRP is essential to facilitate the integrating process. The behaviour of MRP systems is dependent on the complex interactions between the numerous control parameters used. Methodologies/models are developed to set these parameters. The models are based on the Pareto principle. The idea is to use business targets to set a coherent set of parameters, which not only enables those business targets to be realised, but also facilitates JIT implementation. It illustrates this approach in the context of an actual manufacturing plant - IBM Havant. (IBM Havant is a high volume electronics assembly plant with the majority of the materials bought-out). The parameter setting models are applicable to control bought-out items in a wide range of industries and are not dependent on specific MRP software. The models have produced successful results in several companies and are now being developed as commercial products.

Divisions: Aston University (General)
Additional Information: If you have discovered material in AURA which is unlawful e.g. breaches copyright, (either yours or that of a third party) or any other law, including but not limited to those relating to patent, trademark, confidentiality, data protection, obscenity, defamation, libel, then please read our Takedown Policy and contact the service immediately.
Institution: Aston University
Uncontrolled Keywords: inventory control,MRP,JIT,two-bin,ordering policies,rescheduling and dampening policies,safety rules
Last Modified: 08 Dec 2023 08:26
Date Deposited: 01 Feb 2011 12:43
Completed Date: 1992-01
Authors: Shah, Sandeep