The Remote Measurement of Phase Angle

Abstract

In the distribution of electricity, it is necessary to link the outputs of substations, which may be many miles apart. In order to prevent an excessive surge of current in the connecting link, the connection between a pair of substations should not be made until the phase angle between their voltages is small, There has been, for many years, a need for the measurement of this phase angle, with the results displayed in the distribution Control Room, A direct measurement may be significantly in error, due to the time delay in transmission of the measurement signals from substation to Control Room. This error is avoided inthe measurement system described. A test signal, superimposed on the phase measurement signal, repetitively measures the transmission path delay, and applies a suitable correction to the phase angle indication, The system may be used either with pilot lines or a radio link between substations and Control Room, An advantage is that the route of a pilot line may be changed without affecting the accuracy, thus allowing the use of public telephone lines, if necessary. A pilot line system has been installed in the Birmingham Area of the Midlands Electricity Board: the maximum length of pilot line used is 12 miles, and the measurement error does not exceed a small fraction of one degree. The equipment has been designed to possess a high degree of reliability. Although primarily designed for operation at 50 Hz, the system could readily be adapted for use at higher frequencies.

Divisions: College of Engineering & Physical Sciences
Additional Information: Copyright © Nield, 1972. P.N. Nield asserts their moral right to be identified as the author of this thesis. This copy of the thesis has been supplied on condition that anyone who consults it is understood to recognise that its copyright rests with its author and that no quotation from the thesis and no information derived from it may be published without appropriate permission or acknowledgement. If you have discovered material in Aston Publications Explorer which is unlawful e.g. breaches copyright, (either yours or that of a third party) or any other law, including but not limited to those relating to patent, trademark, confidentiality, data protection, obscenity, defamation, libel, then please read our Takedown Policy and contact the service immediately.
Institution: Aston University
Uncontrolled Keywords: remote measurement,phase angle
Last Modified: 08 Dec 2023 08:02
Date Deposited: 12 May 2010 12:39
Completed Date: 1972
Authors: Nield, Philip N.

Export / Share Citation


Statistics

Additional statistics for this record