Testing the value of best value:Evidence from educational facilities projects

Eke, Gerald and Elgy, John (2017). Testing the value of best value:Evidence from educational facilities projects. IN: IGLC 2017 - Proceedings of the 25th Annual Conference of the International Group for Lean Construction. The International Group for Lean Construction.

Abstract

Contractor selection is one of the most important step in ensuring the success of any construction project. Failing to adequately select the winning contractor may lead to problems in the project delivery phase such as bad quality and delay in the expected project duration; which ultimately results in cost overruns. This paper presents an approach by which a what-if scenario can be analysed in educational facilities projects in the UK; therefore if the client selected the best value contractor for a project whose submitted price is not the lowest price, a what-if scenario was conducted to show how the lowest priced contractor would have fared had he/she been awarded the contract instead. This was done by analysing historic data of projects that have selected the lowest priced contractor. Then correlations were derived between variables; which was then be inputted into a Monte Carlo Simulation to analyse 3 real educational facilities projects that used a best value selection method. Using Monte Carlo Simulation allowed us to see all the possible outcomes of cost, and duration. It was concluded that selecting the best value contractor in educational facilities projects may not be necessary in terms of cost.

Publication DOI: https://doi.org/10.24928/2017/0090
Divisions: Engineering & Applied Sciences > Engineering systems & management
Engineering & Applied Sciences > Sustainable environment research group
Engineering & Applied Sciences
Additional Information: Copyright © 2017 by Kenneth Walsh, Editor.
Event Title: 25th Annual Conference of the International Group for Lean Construction, IGLC 2017
Event Type: Other
Event Dates: 2017-07-09 - 2017-07-12
Uncontrolled Keywords: Best value contractor,Contractor selection,Educational facilities projects,Lowest priced contractor,Monte Carlo Simulation,Civil and Structural Engineering,Building and Construction
Full Text Link: http://www.lc3- ... ings-part_1.pdf
Related URLs: http://www.scop ... tnerID=8YFLogxK (Scopus URL)
Published Date: 2017-09-01
Authors: Eke, Gerald
Elgy, John

Download

[img]

Version: Published Version

| Preview

Export / Share Citation


Statistics

Additional statistics for this record