The interaction between master production scheduling and detailed capacity requirements planning : closing the loop in manufacturing resource planning (MRPII) systems

Abstract

The widespread implementation of Manufacturing Resource Planning (MRPII) systems in this country and abroad and the reported dissatisfaction with their use formed the initial basis of this piece of research which concentrates on the fundamental theory and design of the Closed Loop MRPII system itself. The dissertation concentrates on two key aspects namely; how Master Production Scheduling is carried out in differing business environments and how well the `closing of the loop' operates by checking the capcity requirements of the different levels of plans within an organisation. The main hypothesis which is tested is that in U.K. manufacturing industry, resource checks are either not being carried out satisfactorily or they are not being fed back to the appropriate plan in a timely fashion. The research methodology employed involved initial detailed investigations into Master Scheduling and capacity planning in eight diverse manufacturing companies. This was followed by a nationwide survey of users in 349 companies, a survey of all the major suppliers of Production Management software in the U.K. and an analysis of the facilities offered by current software packages. The main conclusion which is drawn is that the hypothesis is proved in the majority of companies in that only just over 50% of companies are attempting Resource and Capacity Planning and only 20% are successfully feeding back CRP information to `close the loop'. Various causative factors are put forward and remedies are suggested.

Divisions: College of Business and Social Sciences > Aston Business School > Operations & Information Management
Additional Information: Department: Aston Business School If you have discovered material in AURA which is unlawful e.g. breaches copyright, (either theirs or that of a third party) or any other law, including but not limited to those relating to patent, trademark, confidentiality, data protection, obscenity, defamation, libel, then please read our Takedown Policy and contact the service immediately.
Institution: Aston University
Uncontrolled Keywords: master production scheduling,capacity requirements planning,rough cut capacity planningmanufacturing resource planning (MRPII) systems,resource requirements planning,MRPII
Last Modified: 08 Dec 2023 08:25
Date Deposited: 01 Feb 2011 11:30
Completed Date: 1991-04
Authors: Burcher, P.G.

Download

Export / Share Citation


Statistics

Additional statistics for this record